Modifications & remeasurement

Lease modifications and remeasurement, without losing history

Change the term, rent or scope and Leascape creates a new version, remeasures it from the effective date and keeps the earlier version, its schedule and its posted journals exactly as they were.

  • New version per change
  • Approved versions locked
  • Stale calculations blocked

Leases change. History shouldn’t.

A lease signed for five years rarely runs exactly as signed. Rents are reviewed, terms are extended, part of the space is handed back, and some leases end early. Each of these changes the lease liability and the right-of-use asset, and Ind AS 116 and IFRS 16 are precise about how.

In a spreadsheet the usual fix is to overwrite the schedule. The new numbers are right, but nobody can see any more what was reported last quarter, or why. Leascape takes the opposite approach: every change creates a new version of the lease, and nothing that was approved or posted is ever edited.

Reassessment or modification?

The standards separate two kinds of change, and they are measured differently:

  • Reassessments come from the lease’s existing terms. An extension or termination option becomes (or stops being) reasonably certain, a purchase option is reassessed, the amount expected under a residual value guarantee changes, or an index or rate used to set payments moves.
  • Modifications change the scope of the lease or its consideration in a way that wasn’t part of the original terms. Examples are adding or giving back space, extending the term by negotiation, or agreeing a new rent.

A change in the lease term or in a purchase option is remeasured with a revised discount rate. Changes in residual value guarantee amounts, or in index- or rate-linked payments, keep the original rate (unless a floating interest rate drives the change).

When a modification is a separate lease

A modification is accounted for as a separate, new lease when both of these are true:

  1. it increases the scope of the lease by adding the right to use one or more underlying assets; and
  2. the consideration rises by an amount commensurate with the stand-alone price for that increase in scope.

Otherwise, at the effective date of the modification, the lessee remeasures the lease liability. It discounts the revised payments at a revised discount rate over the revised lease term. A decrease in scope reduces the carrying amount of the ROU asset to reflect the partial or full termination, with any gain or loss in profit or loss. Every other modification adjusts the ROU asset by the change in the liability.

Worked example: extending a lease

Take a five-year lease at ₹10,00,000 a year, paid in arrears, at a 9% discount rate. After two years, the lease liability is ₹25,31,295 and the ROU asset, after two years of depreciation, is ₹23,33,791. At that point the lessee negotiates a two-year extension, so five annual payments now remain, and its incremental borrowing rate has risen to 10%.

At the effective date of the modification₹
Lease liability before the change25,31,295
Lease liability remeasured: five payments of ₹10,00,000 at 10%37,90,787
Increase in the lease liability12,59,492
ROU asset before the change23,33,791
ROU asset after the change (adjusted by the same amount)35,93,283

From here, interest runs at 10% on the new liability (₹3,79,079 in the first year after the change), and the ROU asset is depreciated over the five remaining years. The extension adds no new asset, so it isn’t a separate lease; the adjustment goes to the existing ROU asset, with nothing through profit or loss on the day.

How Leascape handles a change

When you change the term, rent or scope, Leascape creates a new version of the lease from the effective date, remeasures it from that date, and keeps the old version intact:

  • Version-scoped schedules and journals. Each version has its own schedule and its own journal entries, including the remeasurement entry.
  • Approved versions are locked, not edited. What was approved and posted stays exactly as it was.
  • Stale calculations are blocked from approval. If a version’s inputs change after it was calculated, it must be recalculated before anyone can approve it.

A lease history in Leascape reads like this:

VersionEffectiveChangeStatus
v1 · Commencement01-Apr-2024₹90,000 / month · 60 monthsPosted
v2 · Escalation01-Apr-2025+5% step-up · remeasuredPosted
v3 · Modification01-Apr-2026Term extended · ROU adjustedApproved

An example history, as shown on the Leascape homepage.

Why versions matter at audit

An auditor’s first question about a remeasured lease is “what did you know, and what did you post, at the time?”. With versions, the answer is on screen: the schedule and journals before the change, the inputs that changed, and the remeasurement that followed. There is no need to rebuild an old workbook. Approvals run through a draft-and-approve workflow with role-based access, and posted journals are immutable. See lease journal entries and lease disclosures, where modifications appear in the roll-forwards.

Not every rent change is a modification. A fixed step-up agreed at commencement, such as “5% every 3 years”, is part of the original payments and sits in the schedule from day one. An index-linked review is a reassessment at the original rate. See variable rent and escalations, and for the full lessee model, Ind AS 116 software.

FAQ

Common questions

What happens to the old schedule when a lease is modified?

Nothing. A new version is created from the effective date and remeasured. The earlier version, its schedule and its posted journals are kept unchanged.

Can an approved version be edited?

No. Approved versions are locked. A further change creates another version.

What if a lease’s inputs change after it was calculated?

The calculation becomes stale, and stale calculations are blocked from approval until the version is recalculated.

Does Leascape handle early terminations?

Yes. An early termination is a change to the lease, handled as a new version from its effective date like any other modification.

Request a demo

See your own leases calculated in Leascape

Bring a lease that has been extended or renegotiated, and we’ll show you the versions, the remeasurement and the journals in Leascape.

Prefer email? hello@leascape.com

We use these details only to contact you about a Leascape demo. Submitting opens your own email app — nothing is stored on this site. See the Privacy Policy.